News-Detail

NEWS:
< Flughafen Zürich - Fördertechnik "am Haken"
25.02.2015

Zurich Airport - Conveyor equipment "on the hook"


Further conveyor technology elements were delivered to the new terminal of Zurich airport in a spectacular action which involved a crane unloading the equipment from trucks and positioning it directly to the respective level of the new Check-In area.

This action significates the starting signal for the third and final construction phase at Zurich airport, where in total 52 new Check-In conveyors will be installed.