News-Detail

NEWS:
< Die ersten 52 Check-In am Flughafen Zürich in Betrieb gegangen
13.09.2014

Klatt realises expansion of Posten in Oslo


As part of the expansion of the logistic plant of Posten in Oslo KLATT belt conveyor and roller conveyor systems are integrated through the system integrator Crisplant, part of BEUMER Group.
The project significates a further milestone in the relationship between Klatt and Crisplant. The scope of delivery contains approx. 1000 meter conveyor systems including vertical sorter. The modification is carried out during ongoing operations and is to be completed by mid of 2015.